Client
Thames Water
Main Contractor
Morgan Vinci Bachy
Duration
2010 – 2017
Contract Value
£500m
/
Overview
The project was driven by a massive 9.2m OD Slurry Shield TBM, specifically designed to handle the high hydrostatic pressures of tunnelling through the Chalk layer at depths of up to 80 metres. Our scope involved managing the TBM drive alongside the construction of five Diaphragm-Wall (D-Wall) shafts, some of the largest in Europe with internal diameters up to 44m. Following the primary bore, we delivered the in-situ secondary lining for both the tunnel and shafts, as well as complex RC Slipforms for stair cores and central walls.