The Challenge
The SCS JV required a specialist partner capable of rapidly deploying a comprehensive team of highly skilled personnel to operate and support the 7m diameter Herrenknecht EPB TBM for the 853m drive. The challenge was ensuring seamless integration of specialist labour into the existing workforce, maintaining maximum TBM uptime, and adhering to the stringent safety and quality standards required by the HS2 program.
The Solution
We engaged closely with the SCS JV management team to thoroughly understand the specific mechanical, electrical, operational, and logistical requirements for the Tunnel Boring Machine (TBM) drive. To meet these demands, we supplied a full operational shift cycle of highly specialised tunnelling personnel, covering all areas from the TBM face to ground operations.
TBM Operations & Leadership: Pit Boss, TBM Operators, Lead Miners, TBM Back Up Miners, Multi Service Vehicle Operators (MSV).
Mechanical & Electrical Support: Mechanical Fitters, Electricians.
Ground Support & Logistics: Conveyor Supervisors, Conveyor Operatives, Grout Batching Plant Supervisors/Operators, Water Treatment Plant Operators, Trade Foreman, Crane Supervisors, Slinger/Signallers, Gantry Crane Operators, Plant Operators, Tally Persons.
Segment/Lining: Miners / Erector Operators, Steelfixers, Carpenters.